Cost with waranty. Predictable results.

I estimate a project by its value, avoiding time-based cost.

Conceptualization process, describing the project and implementing it is divided to objectives by stablishing a cost by keeping in mind these next factors:

  • Requeriments

    I determine the knowledge level needs and related techongologies.
  • Value

    I study the mission the project should manage by analyzing dimensions, concurrence and audience.
  • Time.

    I estimate the duration.
  • Speed

    I keep in mind when you need it finished.

My cost estimation is formalized in two documents: a requeriments summary based on interviews with you and a broken down estimation as an objectives list by providing explanations and priority for them.

Finally: you have full powers on cost. Point by point. Broken down and detailed. Without hidden text.

Powered by BlogEngine.NET 1.5.0.7
Theme by Mads Kristensen and customized by Matías Fidemraizer.